decks ...
Site measurements by clients
:
Name :
Contact No.:
E-mail Address:
Measurements:
Vertical heights
Horizontal lengths:
Floor plan area:
No. of stories:
Column and Beam Requirements, if any:
Any further queries:
Notes:
A leveling screed may be required to compensate for adjustments made to accommodate floor to floor levels.
All measurements must be checked on site prior to installation.
A 50mm topping will be required on all Eco Landing Slabs.
The rake of the stringers are to be adjusted on site to the correct on site floor to floor levels.
All stringers must be grouted after installation.
Do not scale, use figured dimensions only.
Large scale details to be used where available.
This drawing is to be read in conjunction with any relevant architectural, structural or other drawings.
Any errors or discrepancies are to be reported immediately for correction before installation commences.
Design imposed loads ...4.0.......kn/m.